Customer RFQ |
Request for offer with product drawings, samples or just concept. |
|
Offer |
submit quotation within 2 days |
|
Order Confirmation |
Project kicks off upon SWIFT of deposit |
|
Layout Assembly Drawing |
2 to 4 days for layout drawings |
|
Detailed Design |
Mold components with detail drawings. |
|
Drawings Final Confirmation |
Drawings are finally confirmed by customer |
|
Schedule |
Follow up the schedule |
|
Mould Manufacture |
Mould manufacture on schedule |
|
Mould Trial Running and Samples Submitted |
Mould trial running on schedule, and Samples are submitted with a detailed inspection report |
|
Sample Confirmation |
After inspected final samples according to specifications customer make a confirmation. |
|
Packing |
tooling finished and packed |
|
Delivery |
Paperwork and a CD of all drawings are sent to customer at the time of the goods shipping. |