Customer RFQ |
Request for offer with product drawings, samples or just concept. |
Offer |
submit quotation within 2 days |
Order Confirmation |
Project kicks off upon SWIFT of deposit |
Layout Assembly Drawing |
2 to 4 days for layout drawings |
Detailed Design |
Mold components with detail drawings. |
Drawings Final Confirmation |
Drawings are finally confirmed by customer |
Schedule |
Follow up the schedule |
Mould Manufacture |
Mould manufacture on schedule |
Mould Trial Running and Samples Submitted |
Mould trial running on schedule, and Samples are submitted with a detailed inspection report |
Sample Confirmation |
After inspected final samples according to specifications customer make a confirmation. |
Packing |
tooling finished and packed |
Delivery |
Paperwork and a CD of all drawings are sent to customer at the time of the goods shipping. |